| 1 |
2007 |
FPSO CIDADE ELECTRICAL POWER MODULE |
FABRICATION AND ASSEMBLY OF E-HOUSE 250MT |
PETROBRAS |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 2 |
2008 |
SHELL ECC PROJECT |
FABRICATION AND ASSEMBLY OF CARBON STEEL TANKS & SPREADER BAR 551.47MT |
SHELL EASTERN PETROLEUM |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 3 |
2008 -2009 |
SEPC – MEG PROJECT |
SHOP FABRICATION OF STAINLESS STEEL, LOW TEMPERATURE, AND STEAMLINES PIPE SPOOLS 78,005.00 IN DIA |
SHELL EASTERN PETROLEUM |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 4 |
2009 |
TUPI FPSO CIDADE MV22 |
FABRICATION & ASSEMBLY OF MODULE 4S SUPPORT LEG, COLUMN & BRACING 43MT |
PETROBRAS |
PT. VME PROCESS |
JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 5 |
2009 |
HP FUEL GAS COMPRESSOR RCK10-11/351 |
FABRICATION, ASSEMBLY, HYDRO-TESTING & REINSTATEMENT OF CARBON AND STAINLESS STEEL PIPE SPOOLS 9,950 IN DIA |
FLOATECH |
PT. VME PROCESS |
JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 6 |
2009 |
ULTRACO PROJECT |
SHOP FABRICATION & ASSEMBLY OF DOUBLE SPAN GILDER GANTRY CRANE 15TON X 14M-W 8.61MT |
ULTRACO |
ULTRACO |
JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 7 |
2009 |
SPT ( SINGAPORE PARALLEL TRAIN OLEFIN RECOVERY PROJECT ) |
SHOP FABRICATION OF CARBON STEEL 34,182.00 IN DIA & STAINLESS STEEL 4,220.50 IN DIA |
EXXON MOBILE |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 8 |
2010 |
FPSO TERANG SIRASUN BATUR FIELD DEVELOPMENT |
FABRICATION & ASSEMBLY OF STRUCTURE 727.30MT AND FABRICATION, ASSEMBLY, HYDRO-TESTING & REINSTATEMENT OF PIPE SPOOLS 47,000.00 IN DIA |
KANGEAN ENERGY INDONESIA |
PT. VME PROCESS |
JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 9 |
2011 |
SBM |
LABOR SUPPLY FABRICATION & ASSEMBLY OF STRUCTURE AND FABRICATION, ASSEMBLY, HYDRO-TESTING & REINSTATEMENT OF PIPE SPOOLS |
PETROBRAS |
PT. VME PROCESS |
@JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 10 |
2011 |
PAPA TERRA FIELD DEVELOPMENT P-61 |
FABRICATION & ASSEMBLY OF E-HOUSE 286.99MT |
SIEMENS-FLOATEC |
PT. VME PROCESS |
JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 11 |
2011 |
PAPA TERRA FIELD DEVELOPMENT P-61 |
LABOR SUPPLY FABRICATION & ASSEMBLY OF E-HOUSE |
SIEMENS-FLOATEC |
PT. VME PROCESS |
JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 12 |
2011 |
TSP OFFSHORE CRUDE OIL TREATMENT PROJECT |
FABRICATION, ASSEMBLY, HYDRO-TESTING & REINSTATEMENT OF PIPE SPOOLS 10,501.75 IN DIA (SKID 1 : Surge Vessel & Pump , SKID 2 : Heat Exchanger, SKID 3 : Teak Bulk Oil Seperator, SKID 4 : Samaan & Poui Bulk Oil Seperator, SKID 5 : Electrostatic Treater ) |
REPSOL |
PT. VME PROCESS |
JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 13 |
2011 |
VAM4 & AAL4 PLANTS |
SHOP FABRICATION OF CARBON , STAINLESS STEEL & JACKET PIPE SPOOLS 61,075.00 IN DIA |
CCD |
PT. ROTARY ENGINEERING IND |
JLN. BRIGJEND KATAMSO KM.6 TANJUNG UNCANG, BATAM - INDONESIA |
| 14 |
2012 |
FPSO CIDADE DE MANGARATIBA MV-24 |
FABRICATION & ASSEMBLY OF STRUCTURE 727.27MT |
MODEC/MITSUBISHI |
PT. VME PROCESS |
JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 15 |
2012 |
NAGA & PLIKAN WELLHEAD JACKET |
FIT UP & ASSEMBLY OF JACKET 3,012.61MT |
PREMIER OIL |
PT. SMOE INDONESIA |
KAWASAN INDUSTRI TERPADU KABIL, JLN HANG KESTURI VI LOT.5-1, BATAM - INDONESIA |
| 16 |
2012 |
MEMBRANE CO2 SEPARATION SKID |
FABRICATION & ASSEMBLY OF STRUCTURE 20.42MT AND FABRICATION, ASSEMBLY, HYDRO-TESTING & REINSTATEMENT OF PIPE SPOOLS 8,743.00 IN DIA |
AIR LIQUIDE |
PT. VME PROCESS |
JLN. BAWAL, KAV.3 BATU MERAH. BATAM - INDONESIA |
| 17 |
2013 |
AUSTRALIA PACIFIC LNG PROJECT |
LABOR SUPPLY FABRICATION & ASSEMBLY OF STRUCTURE & PIPING |
BECHTEL |
PT. SMOE INDONESIA |
KAWASAN INDUSTRI TERPADU KABIL, JLN HANG KESTURI VI LOT.5-1, BATAM - INDONESIA |
| 18 |
2013 |
GAJAH BARU – CPP PROJECT |
LABOR SUPPLY FOR OFFSHORE PIPING MODIFICATION & SHUTDOWN PROJECT 19,190.50 MAN HOURS |
PREMIER OIL |
PT. SMOE INDONESIA |
OFFSHORE |
| 19 |
2013 |
ANOA FIELD PROJECT |
LABOR SUPPLY FOR OFFSHORE GRE PIPE SPOOL MODIFICATION, FABIRICATION & ASSEMBLY 1,336.00 MAN HOURS |
PREMIER OIL |
PT. TIMAS SUPLINDO E&C |
OFFSHORE |
| 20 |
2013 |
EVONIK Me5 – PIPE RACK ASSEMBLY |
FABRICATION & ASSEMBLY OF PIPE RACK 374.27MT AND FABRICATION & ASSEMBLY OF CARBON , STAINLESS STEEL PIPE SPOOLS 9,202.00 IN DIA |
EVONIK |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 21 |
2013 |
NAGA & PELIKAN WELLHEAD PROJET |
LABOR SUPPLY FOR FABRICATION & ASSEMBLY OF CARBON STEEL & STAINLESS STEEL PIPE SPOOLS 45,407.50 MAN HOURS |
PREMIER OIL |
PT. SMOE INDONESIA |
KAWASAN INDUSTRI TERPADU KABIL, JLN HANG KESTURI VI LOT.5-1, BATAM - INDONESIA |
| 22 |
L2013 |
PHASE.6 STORAGE TANK DEVELOPMENT |
FABRICATION OF CARBON PIPE SPOOLS 102,952.75 IN DIA |
TANK STORE |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 23 |
2013 |
PETROBRAS FPSO CIDADE DE ITAGUAI MV26 (CIP MODULE) |
FABRICATION & ASSEMBLY OF STRUCTURE 386.66MT AND FABRICATION, ASSEMBLY, HYDRO-TESTING & REINSTATEMENT OF PIPE SPOOLS 9,682.50 IN DIA |
MODEC |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 24 |
2013 |
PETROBRAS FPSO CIDADE DE ITAGUAI MV26 (CIP MODULE) |
FABRICATION & ASSEMBLY OF STAINLESS STEEL TANKS 45.00MT AND FABRICATION & ASSEMBLY OF SPOOL NOZZLES 500.00 IN DIA |
MODEC |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 25 |
2014 |
PETROBRAS P-74 MODULE 17 E-HOUSE |
LABOR SUPPLY FOR FABRICATION OF BUILT-UP BEAM 18,554.00 MAN HOURS |
PETROBRAS |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 26 |
2014 |
YUCAL PLACER PHASE 300 |
FABRICATION & ASEEMBLY OF CARBON STEEL MEMBRANE TUBES 2,160.00 IN DIA |
AIR LIQUIDE DORIS YPERGAS |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 27 |
2014 |
YUCAL PLACER PHASE 300 |
FABRICATION & ASSEMBLY OF STRUCTURE 88.34MT AND FABRICATION, ASSEMBLY, HYDRO-TESTING & REINSTATEMENT OF PIPE SPOOLS 13,197.00 IN DIA |
AIR LIQUIDE DORIS YPERGAS |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 28 |
2014 |
PETROBRAS P-74 MODULE 17 E-HOUSE |
LABOR SUPPLY FOR FABRICATION & ASSEMBLY OF ELECTRICAL POWER CONTROL ROOM (E-HOUSE) 249.411.95 MAN HOURS |
PETROBRAS |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 29 |
2014 |
LUBE OIL BLENDING PLANT ( LOBP ) |
FABRICATION OF CARBON PIPE SPOOLS 47,431.50 IN DIA |
TOTAL |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 30 |
2014 |
SAUDI ARAMCO WASIT ( MEG GAS PLANT ) |
LABOR SUPPLY FOR FABRICATION & ASSEMBLY OF STAINLESS STEEL, INCOLOY, SS DUPLEX & CuNI PIPE SPOOLS 143,240.50 MAN HOURS |
SAUDI ARAMCO |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 31 |
2014 |
SAUDI ARAMCO WASIT ( MEG GAS PLANT ) |
FABRICATION OF CARBON STEEL PIPE SPOOLS 48,292.10 IN DIA |
SAUDI ARAMCO |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 32 |
2014 |
SAUDI ARAMCO WASIT ( MEG GAS PLANT ) |
FABRICATION OF CARBON STEEL OUT-FITING & ACCESS PLATFORM FOR PIPE RACK 153.50 MT |
SAUDI ARAMCO |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 33 |
2014 |
MEG PRETREATMENT, RECLAMATION AND REGENERATION PACKAGE |
LABOR SUPPLY FOR FABRICATION & ASSEMBLY OF STURUCTURE AND PIPE SPOOLS |
HYUNDAI |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 34 |
2014 |
ALKOXYLATION PROJECT |
FABRICATION OF STAINLESS STEEL PIPE SPOOLS 6,192.00 IN DIA |
CRODA |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 35 |
2014 |
BERTAM FPSO PROJECT |
LABOR SUPPLY FOR FABRICATION & ASSEMBLY OF PIPE SPOOLS 1,861.00 MAN HOURS |
PETROBRAS |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 36 |
2014 |
TEN DEVELOPMENT PROJECT: FPSO PACKAGE |
LABOR SUPPLY FOR FABRICATION & ASSEMBLY OF STRUCTURE AND FABRICATION, ASEEMBLY, HYDRO-TESTING & REINSTATEMENT OF PIPE SPOOLS 96,297.00 MAN HOURS |
MODEC |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 37 |
2014 |
SAUDI ARAMCO WASIT ( MEG GAS PLANT ) |
LABOR SUPPLY FOR FABRICATION & ASSEMBLY OF PIPE RACK AND PIPE SPOOLS 676,293.30 MAN HOURS |
SAUDI ARAMCO |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 38 |
2015 - 2016 |
WHEATSTONE PROJECT LNG PLANT |
LABOR SUPPLY FABRICATION & ASSEMBLY OF STRUCTURE & PIPING 408,752.57 MAN HOURS |
BECHTEL |
PT. SMOE INDONESIA |
KAWASAN INDUSTRI TERPADU KABIL, JLN HANG KESTURI VI LOT.5-1, BATAM - INDONESIA |
| 39 |
2015 - 2016 |
MADURA BD FIELD DEVELOPMENT |
FABRICATION & ASSEMBLY OF STRUCTURE 1120.28MT AND FABRICATION, ASSEMBLY, HYDRO-TESTING & REINSTATEMENT OF PIPE SPOOLS 52,955.09 IN DIA |
HUSKY CNOOC MADURA LIMITED |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 40 |
2015 - 2016 |
GHANA OCTP DEVELOPMENT PROJECT |
LABOR SUPPLY FABRICATION & ASSEMBLY OF STRUCTURE & PIPING 98,174.50 MAN HOURS |
YINSON |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 41 |
2015 - 2016 |
JURONG GREASE PLANT |
FABRICATION OF CARBON PIPE SPOOLS 20,516.00 IN DIA |
EXXON MOBILE |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 42 |
2016 |
TRUCKING FACILITY FOR SLNG TERMINAL |
FABRICATION & ASSEMBLY OF STRUCTURE 6.80MT AND FABRICATION, ASSEMBLY, HYDRO-TESTING & REINSTATEMENT OF PIPE SPOOLS 2,000.00 IN DIA |
SAMSUNG LNG CORPORATION |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 43 |
2016 |
SINGAPORE LIQUID NATURAL GAS |
FABRICATION OF CARBON PIPE SPOOLS ESTIMATION 80.000,00 IN DIA |
SAMSUNG |
PT. ROTARY ENGINEERING IND |
JL. BRIGJEND KATAMSO KM.6, TANJUNG UNCANG, BATAM, INDONESIA |
| 44 |
2018 |
MOBILE POWERPLANT NIAS 25 MW |
FABRICATION,BLASTING & PAINTING OF CARBON STEEL, STAINLESS STEEL PIPE SPOOLS AND PIPE SUPPORTS. ESTIMATION 14,000 IN DIA |
PT. PLN (PERSERO) |
PT. TRIPATRA ENGINEERS AND CONSTRUCTORS |
SARANA INDUSTRIAL POINT, BLOCK E, NO. 3 BATAM CENTRE 29431. BATAM - INDONESIA |
| 45 |
2018 - 2019 |
MOBILE POWERPLANT NIAS 25 MW |
PIPING SITE INSTALLATION. ESTIMATION 10,000 IN DIA |
PT. PLN (PERSERO) |
PT. TRIPATRA ENGINEERS AND CONSTRUCTORS |
GUNUNGSITOLI, NIAS. SUMATERA UTARA - INDONESIA |
| 46 |
2019 |
JOHAN CASTBERG |
LABOUR SUPPLY FABRICATION FPSO TOTAL MANHOURS 27.673 |
JOHAN CASTBERG |
PT. SMOE INDONESIA |
KAWASAN INDUSTRI TERPADU KABIL, JLN HANG KESTURI VI LOT.5-1, BATAM - INDONESIA |
| 47 |
2019 |
ENI MEXICO-AREA 1 |
FABRICATION AND ASSEMBLY OF STRUCTURE WORK TOTAL 97MT AND ,FABRICATION,ASSEMBLY, AND REINSTATEMENT OF PIPE SPOOL LTCS,CS,SS,CUNI TOTAL 4481 DIA INCH |
MODEC – ENI MEXICO |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |
| 48 |
2019 - 2020 |
TYRA REDEVELOPEMENT PROJECT |
FABRICATION AND ASSEMBLY OF STRUCTURE WORK TOTAL 70MT AND FABRICATION,ASSEMBLY OF PIPE SPOOL LTCS,SS,DUPLEX TOTAL 6036.25 DIA INCH |
TOTAL - MCDERMOTT |
PT. VME PROCESS |
JLN. TAMALATEA RT04/RW03, KELURAHAN TANJUNG SENGKUANG, BATU AMPAR, BATAM, INDONESIA |